loading
HANDBOOK OF - HANDBOOK OF MECHANICAL ENGINEERING CALCULATIONS
HI/HYDRAUL
A description is not available for this item.
Inorganic Chemistry: From Periodic Classification to Crystals
January 1, 2018 - WILEY

Using classification, diagrams and crystallography elements, we describe in this book the bonds in the crystals using the basic patterns. The use of various criteria such as ionicity character of the bonds, the use of hard sphere models, the...

CSA Z234.4 - All-Numeric Dates and Times
December 1, 1989 - CSA

This Standard covers the writing, typing, and printing of dates and times when all-numeric forms are used, and is applicable for general use. This Standard is less comprehensive than, but not in conflict with, CAN/CSA-Z234.5 (Adopted ISO Standard 8601),...

Aggregation-Induced Emission: Applications
January 1, 2014 - WILEY

Aggregation-Induced Emission (AIE) is a novel photophysical phenomenon which offers a new platform APPLICATIONS for researchers to look into the light-emitting processes from luminogen aggregates, from which useful information on structureproperty relationships may be collected and...

DI-PSSS-82201 - LONG LEAD TIMES MATERIAL REPORT
April 17, 2018 - NPFC
A description is not available for this item.
NR/SIN/133 - Assessment of Level Crossing Closure Times
July 16, 2014 - NR

The SIN applies to all automatic level crossings. The types of crossing in scope include the following. The list may not be exhaustive: Automatic Half Barrier (AHB); equipped with road traffic lights and audible warning Automatic Half Barrier with local or remote monitoring...

ASTM D7278-21 - Standard Guide for Prediction of Analyzer Sample System Lag Times
December 1, 2021 - ASTM International

5.1 The analyzer sample system lag time estimated by this guide can be used in conjunction with the analyzer output to aid in optimizing control of blender facilities or process units. A known and constant lag time is key for the use in optimizing control. 5.2 The...

NR/SIN/170 - Manage Risk of Extended Closure Times at Automatic Level Crossings
February 1, 2019 - NR

The SIN applies to the list of automatic level crossings collated by the Signalling RAMs and analysed under the scope of NR/SIN/137. Purpose This Special Inspection Notice (SIN) mandates the process to: a) assess the risk of automatic level crossings which present with...

ASTM D7278-16 - Standard Guide for Prediction of Analyzer Sample System Lag Times
April 1, 2016 - ASTM International

5.1 The analyzer sample system lag time estimated by this guide can be used in conjunction with the analyzer output to aid in optimizing control of blender facilities or process units. 5.2 The lag time can be used in the tuning of control programs to set the...

CSA CAN3-Z234.4 - ALL-NUMERIC DATES AND TIMES
CSA
A description is not available for this item.
Advertisement